+33 (0)3 87 71 33 11 contact@rothermel.fr

Installation of cabins

Installation of cabins for the ArcelorMittal Fos/Mer site on a casting bridge.
Technical rooms under main beams for air conditioning and electrical equipment.
A new control booth has also been installed. Work for Schneider Electric for the electrical room part
Thanks to SOLSI-CAD for the calculation note, KUTHE for the air conditioning and their professionalism.